Contents

ENGR333 project Fall 2005

Description

In the Fall 2005 semester, I challenged the ENGR333 students to “develop realistic designs for the wellness center HVAC system and upgraded physical plant infrastructure.”

Customer

The customer for this project was Calvin’s VP for finance Henry DeVries.

Documents

The assignment can be found at the following link.

2005 project assignment

Sadly, the results of the project have been lost the sands of time. I lack any record of the final reports or presentations.