ENGR333 project Fall 2005
Contents
Description
In the Fall 2005 semester, I challenged the ENGR333 students to “develop realistic designs for the wellness center HVAC system and upgraded physical plant infrastructure.”
Customer
The customer for this project was Calvin’s VP for finance Henry DeVries.
Documents
The assignment can be found at the following link.
Sadly, the results of the project have been lost the sands of time. I lack any record of the final reports or presentations.